Skip to content
IMG_20210914_115829_149

Casos de éxito

IMG_20210914_115829_149

Construction Manager / property representative services during project development and construction of 3 new production plants (6 new buildings of 119,000 m² in total) in Turkey .

Project Management
cabecera

Project Management in the development process of the Gestamp plant expansion project in Kenitra, Morocco.

Project Management
cof

Project Management in the development process of the Gestamp plant expansion project in Pitesti, Romania

Project Management
Imagen 1

Project to improve Energy Efficiency for production plants-Gestamp

 

 

Technical Assistance
0_CABECERA

Technical assistance for the adaptation of different spaces within the building of the Museum of Reproductions located on Calle Conde Mirasol in Bilbao.

Technical Assistance
0_CABECERA

Technical assistance for the management of the Rural Hotel Mendigoikoabekoa in Atxondo (Bizkaia

Technical Assistance
0_CABECERA

Technical assistance in heritage management for its correct conservation and enhancement of the monumental complex of the Grandes Molinos Vascos in Bilbao (Bizkaia).

Technical Assistance
Bosque de Oma

Drafting of a technical report on the current state of the trails of the Oma Forest in Kortezubi (Bizkaia).

Technical Reports
Museo Arqueológico Bilbao / Arkeologi Museoa

Drafting of the Technical Report on the stability analysis of the Alabaster Wall on the facade of the Museo de Arqueología / Arkeologi Museoa de Bilbao building (Bizkaia).

Technical Reports
Captura de pantalla 2021-10-28 a las 14.36.48

Analysis and proposal to improve accessibility in the urban environment of the Galdakao-Usansolo Hospital.

Technical Reports

Ikea Barakaldo

Execution Project, license management and Construction Management to optimize the facilities in Ikea, Barakaldo. (Bizkaia)

Projects and Construction Management
Gestamp - Abrera

Design, drafting of the Execution Project, license management and Construction Management in Barcelona for the construction of the metal structure walkway that connects the production plant with the office building at 8m.

Projects and Construction Management
EDIFICIO

Technical assistance in property architect work for the New Building Phase 3 project in the AIC complex in Boroa, Amorebieta-Etxano (Bizkaia).

Project Management
0_CABECERA

Design and drafting of the Execution Project, license management and Construction Management, for the fitting out of the multipurpose room at the Athletic Club Museum in the San Mames stadium in Bilbao

Projects and Construction Management
0_CABECERA

Technical assistance in heritage management for its correct conservation and enhancement of the monumental complex of the Grandes Molinos Vascos in Bilbao (Bizkaia).

Technical Assistance
Museo Arqueológico Bilbao / Arkeologi Museoa

Drafting of the Technical Report on the stability analysis of the Alabaster Wall on the facade of the Museo de Arqueología / Arkeologi Museoa de Bilbao building (Bizkaia).

Technical Reports