Skip to content
CABECERA 1 copia

BILBAO KIROLAK ROWING PAVILION

Award of the Tender promoted by Bilbao Kirolak (Bilbao Municipal Sports Institute) for the Drafting of the Execution Project and Construction Management for the rehabilitation/adaptation of the Rowing Pavilion in Bilbao (Bizkaia).

Sector:
Sports
Location:
Bilbao, Bizkaia
Client:
Bilbao Kirolak
Area
1936,28m2
Status:
Finished
estado actual

The project rehabilitates a disused warehouse of various heights in an unbeatable location for its intended use. A series of demolitions and cuts result in the volume and surface area necessary to accommodate the installations.

1

The new uses are arranged in harmony with the structure and keep the essence of the old nave latent. The boat storage hangar with large doors giving direct access to the outside and the rowing pit constitute the heart of the building, complemented by the changing rooms, gym and technical rooms

0_CABECERA

The existing brick enclosure is dressed in a new layer of metal slats seeking to combine its own industrial identity with a more modern aesthetic, by the urban transformation that the city is undergoing.

0_CABECERA

Technical assistance for the adaptation of different spaces within the building of the Museum of Reproductions located on Calle Conde Mirasol in Bilbao.

Technical Assistance
Gestamp - Abrera

Design, drafting of the Execution Project, license management and Construction Management in Barcelona for the construction of the metal structure walkway that connects the production plant with the office building at 8m.

Projects and Construction Management
IMG_20190916_120342

Evaluation of the accessibility conditions of citizen care services in all Ertzaintza police stations in the Basque Autonomous Community

Technical Reports
cabecera

Project Management in the development process of the Gestamp plant expansion project in Kenitra, Morocco.

Project Management
0_CABECERA

Technical assistance in property architect work for the demolition project of the old Microdeco pavilion in the AIC complex in Boroa, Amorebieta-Etxano (Bizkaia).

Project Management
Captura de pantalla 2021-10-28 a las 14.36.48

Analysis and proposal to improve accessibility in the urban environment of the Galdakao-Usansolo Hospital.

Technical Reports
GLA Arasur

Drafting of the Execution Project, Activity Project, license management and Construction Management for the implementation of a production plant of 8,200m² for Gestamp in the Arasur de Rivabellosa Logistics Park (Araba).

Projects and Construction Management
Ikea Barakaldo

Execution Project, license management and Construction Management to optimize the facilities in Ikea, Barakaldo. (Bizkaia)

Projects and Construction Management