GLA Arasur

GLA Arasur production plant

Drafting of the Execution Project, Activity Project, license management and Construction Management for the implementation of a production plant of 8,200m² for Gestamp in the Arasur de Rivabellosa Logistics Park (Araba).

Sector:
Automotive
Location:
Rivabellosa, Araba
Client:
Gestamp
Area
8.200m²
Status:
Finished
GLA Arasur

The plant is projected with technical rooms for R + D + I and metrology, production machinery and storage area on the ground floor and two independent areas on the first floor that include on the one hand the office area and meeting rooms and on the other hand the changing room and dining room area for the production staff.

GLA Arasur

A small building is projected on the rear façade where the facilities (Compressors and Sectioning Center) are centralized. The project ends with the action on the existing facades, giving them finishes and corporate signage.

GLA Arasur

The challenge consisted of fluently combining the production plant with the technical spaces of R + D + I, metrology and administration.

gla_04

Aware of the importance of production machinery in projects of this type, their disposition is taken care of during all phases of the project, working on the "layout" together with the suppliers during the project phase and guaranteeing the correct execution of their services in the project phase. construction site.

GLA Arasur

The performance culminates in an exterior in line with the company's standards, incorporating the corporate colours and labels that are a sign of its identity.

0_CABECERA

Technical assistance for the management of the Rural Hotel Mendigoikoabekoa in Atxondo (Bizkaia

Technical Assistance
1

Drafting of the Execution Project, Activity Project, management of licenses and Construction Management to enable the warehouse as a 1,200 m² museum warehouse for Bilbao Bizkaia Museoak in Zamudio (Bizkaia).

Projects and Construction Management
Gestamp - Abrera

Design, drafting of the Execution Project, license management and Construction Management in Barcelona for the construction of the metal structure walkway that connects the production plant with the office building at 8m.

Projects and Construction Management
Imagen nitra

Project Management in the process of project development and construction of the new Gestamp production plant in Nitra-Slovakia.

Project Management
Captura de pantalla 2021-10-28 a las 14.36.48

Analysis and proposal to improve accessibility in the urban environment of the Galdakao-Usansolo Hospital.

Technical Reports
CABECERA 1 copia

Award of the Tender promoted by Bilbao Kirolak (Bilbao Municipal Sports Institute) for the Drafting of the Execution Project and Construction Management for the rehabilitation/adaptation of the Rowing Pavilion in Bilbao (Bizkaia).

Projects and Construction Management
Captura de pantalla 2021-11-05 a las 13.05.46

Technical Assistance in works of the architect of the property for the Comprehensive Reform project of the Euskal Museoa in Bilbao (Bizkaia).

 

Project Management
Museo Arqueológico Bilbao / Arkeologi Museoa

Drafting of the Technical Report on the stability analysis of the Alabaster Wall on the facade of the Museo de Arqueología / Arkeologi Museoa de Bilbao building (Bizkaia).

Technical Reports