Skip to content
Captura de pantalla 2021-10-28 a las 14.36.48

OSAKIDETZA. GOBIERNO VASCO

Analysis and proposal to improve accessibility in the urban environment of the Galdakao-Usansolo Hospital.

Sector:
Public/ Health
Location:
Galdakao, Bizkaia
Client:
Departamento de Salud. Gobierno Vasco
Area
25.000m²
Status:
Active
llamada 1

Given the concern of the centre's management regarding the accessibility conditions in the urban space surrounding the Hospital, they commissioned us to analyze their situation and propose improvements.

llamada 2

The analysis of the documentation provided is combined with visits for the most exhaustive data collection of the spaces to be analysed. From the first contact, the close relationship of pedestrian traffic with the internal road network and the existing number of parking spaces is detected.

Captura de pantalla 2021-10-28 a las 14.32.53

Although it exceeds the original object of the project, to offer an adequate technical response, we see it necessary to make a global proposal combining the three aspects, so the solution presented includes the accessibility solution accompanied by an improvement in the flow of circulation and without relevant impact in the number of parking spaces.

llamada 3

The final result achieves the objective of guaranteeing universal accessibility in the hospital environment and offers the added value of improving serious underlying problems not identified by the owner.

Museo Arqueológico Bilbao / Arkeologi Museoa

Drafting of the Technical Report on the stability analysis of the Alabaster Wall on the facade of the Museo de Arqueología / Arkeologi Museoa de Bilbao building (Bizkaia).

Technical Reports
IMG_20210914_115829_149

Construction Manager / property representative services during project development and construction of 3 new production plants (6 new buildings of 119,000 m² in total) in Turkey .

Project Management
GLA Arasur

Drafting of the Execution Project, Activity Project, license management and Construction Management for the implementation of a production plant of 8,200m² for Gestamp in the Arasur de Rivabellosa Logistics Park (Araba).

Projects and Construction Management
1

Drafting of the Execution Project, Activity Project, management of licenses and Construction Management to enable the warehouse as a 1,200 m² museum warehouse for Bilbao Bizkaia Museoak in Zamudio (Bizkaia).

Projects and Construction Management
EDIFICIO

Technical assistance in property architect work for the New Building Phase 3 project in the AIC complex in Boroa, Amorebieta-Etxano (Bizkaia).

Project Management
0_CABECERA

Technical assistance in property architect work for the demolition project of the old Microdeco pavilion in the AIC complex in Boroa, Amorebieta-Etxano (Bizkaia).

Project Management
Imagen 1

Project to improve Energy Efficiency for production plants-Gestamp

 

 

Technical Assistance
CABECERA 1 copia

Award of the Tender promoted by Bilbao Kirolak (Bilbao Municipal Sports Institute) for the Drafting of the Execution Project and Construction Management for the rehabilitation/adaptation of the Rowing Pavilion in Bilbao (Bizkaia).

Projects and Construction Management