ENERGY EFFICIENCY-GESTAMP

Project to improve Energy Efficiency for production plants-Gestamp

 

 

Sector:
Automotive
Location:
Germany, England, Poland, Czech Republic
Client:
Gestamp
Status:
Finalized
Captura de pantalla 2021-11-05 a las 12.47.57

Due to the increase in business energy expenditure, the evolution and trend of prices in constant growth in general, the implementation of new stamping technologies and the construction of new plants, Gestamp launches the Energy Efficiency project in 14 production plants distributed throughout Europe.

Captura de pantalla 2021-11-05 a las 12.39.11

We participate in the comprehensive management of the process of definition and installation of monitoring systems, analysis and interpretation of the data obtained from energy consumption (production, auxiliary) for the technical definition of energy-saving measures that meet economic specifications and techniques established in the project.

Captura de pantalla 2021-11-05 a las 12.42.59

The process continues with the management of the contracting, implementation and monitoring of the different works. Finally, we carry out the follow-up, monitoring and fine-tuning of the energy-saving measures implemented in the plants, to achieve the reduction of energy consumption and the corresponding economic expense.

Captura de pantalla 2021-11-05 a las 12.44.37

The implementation of nearly 130 energy-saving measures resulted in savings in energy expenditure of more than 10% of the total in the first year and an additional 5% in the second.

Ikea Barakaldo

Execution Project, license management and Construction Management to optimize the facilities in Ikea, Barakaldo. (Bizkaia)

Projects and Construction Management
cabecera

Project Management in the development process of the Gestamp plant expansion project in Kenitra, Morocco.

Project Management
0_CABECERA

Technical assistance for the adaptation of different spaces within the building of the Museum of Reproductions located on Calle Conde Mirasol in Bilbao.

Technical Assistance
Captura de pantalla 2021-11-05 a las 13.05.46

Technical Assistance in works of the architect of the property for the Comprehensive Reform project of the Euskal Museoa in Bilbao (Bizkaia).

 

Project Management
Museo Arqueológico Bilbao / Arkeologi Museoa

Drafting of the Technical Report on the stability analysis of the Alabaster Wall on the facade of the Museo de Arqueología / Arkeologi Museoa de Bilbao building (Bizkaia).

Technical Reports
GLA Arasur

Drafting of the Execution Project, Activity Project, license management and Construction Management for the implementation of a production plant of 8,200m² for Gestamp in the Arasur de Rivabellosa Logistics Park (Araba).

Projects and Construction Management
Imagen nitra

Project Management in the process of project development and construction of the new Gestamp production plant in Nitra-Slovakia.

Project Management
0_CABECERA

Technical assistance for the management of the Rural Hotel Mendigoikoabekoa in Atxondo (Bizkaia

Technical Assistance