Skip to content
Museo Arqueológico Bilbao / Arkeologi Museoa

Technical Reports

Museo Arqueológico Bilbao / Arkeologi Museoa

Drafting of the Technical Report on the stability analysis of the Alabaster Wall on the facade of the Museo de Arqueología / Arkeologi Museoa de Bilbao building (Bizkaia).

Technical Reports
Bosque de Oma

Drafting of a technical report on the current state of the trails of the Oma Forest in Kortezubi (Bizkaia).

Technical Reports
IMG_20190916_120342

Evaluation of the accessibility conditions of citizen care services in all Ertzaintza police stations in the Basque Autonomous Community

Technical Reports
Captura de pantalla 2021-10-28 a las 14.36.48

Analysis and proposal to improve accessibility in the urban environment of the Galdakao-Usansolo Hospital.

Technical Reports

cof

Project Management in the development process of the Gestamp plant expansion project in Pitesti, Romania

Project Management
Gestamp - Abrera

Design, drafting of the Execution Project, license management and Construction Management in Barcelona for the construction of the metal structure walkway that connects the production plant with the office building at 8m.

Projects and Construction Management
cabecera

Project Management in the development process of the Gestamp plant expansion project in Kenitra, Morocco.

Project Management
0_CABECERA

Technical assistance in heritage management for its correct conservation and enhancement of the monumental complex of the Grandes Molinos Vascos in Bilbao (Bizkaia).

Technical Assistance
IMG_20210914_115829_149

Construction Manager / property representative services during project development and construction of 3 new production plants (6 new buildings of 119,000 m² in total) in Turkey .

Project Management
Ikea Barakaldo

Execution Project, license management and Construction Management to optimize the facilities in Ikea, Barakaldo. (Bizkaia)

Projects and Construction Management