Skip to content
cof

EXPANSION OF PRODUCTIVE PLANT IN ROMANIA

Project Management in the development process of the Gestamp plant expansion project in Pitesti, Romania

Sector:
Automotive
Location:
Pitesti, Rumania
Client:
Gestamp
Area
10.000 m²
Status:
Finished
cof

We have supported the property in the process of expanding the Gestamp plant in Pitesti, Romania, with an area of 10,000m², performing tasks Construction Manager (property representative).

 

sdr

The expansion was carried out in an existing 6,000 m2 warehouse, to which different extensions were added in various phases without affecting production. Initially, the extension of the lower warehouse of 2000 m2 was carried out, and in a second phase, an extension of 8000 m2 of the upper warehouse was carried out.

 

cof

We carry out the management and coordination of different teams, both local and external, from the initial phases of preliminary studies to the architectural design, the production layout and the execution phase, guaranteeing the opening in time, cost, quality and compliance with the minimum standards set by Gestamp.

Captura de pantalla 2021-10-28 a las 14.36.48

Analysis and proposal to improve accessibility in the urban environment of the Galdakao-Usansolo Hospital.

Technical Reports
IMG_20210914_115829_149

Construction Manager / property representative services during project development and construction of 3 new production plants (6 new buildings of 119,000 m² in total) in Turkey .

Project Management
Ikea Barakaldo

Execution Project, license management and Construction Management to optimize the facilities in Ikea, Barakaldo. (Bizkaia)

Projects and Construction Management
Museo Arqueológico Bilbao / Arkeologi Museoa

Drafting of the Technical Report on the stability analysis of the Alabaster Wall on the facade of the Museo de Arqueología / Arkeologi Museoa de Bilbao building (Bizkaia).

Technical Reports
Gestamp - Abrera

Design, drafting of the Execution Project, license management and Construction Management in Barcelona for the construction of the metal structure walkway that connects the production plant with the office building at 8m.

Projects and Construction Management
Imagen nitra

Project Management in the process of project development and construction of the new Gestamp production plant in Nitra-Slovakia.

Project Management
0_CABECERA

Design and drafting of the Execution Project, license management and Construction Management, for the fitting out of the multipurpose room at the Athletic Club Museum in the San Mames stadium in Bilbao

Projects and Construction Management
Captura de pantalla 2021-11-05 a las 13.05.46

Technical Assistance in works of the architect of the property for the Comprehensive Reform project of the Euskal Museoa in Bilbao (Bizkaia).

 

Project Management