Skip to content
1

BILBAO BIZKAIA MUSEOAK. EXTERNAL DEPOSIT

Drafting of the Execution Project, Activity Project, management of licenses and Construction Management to enable the warehouse as a 1,200 m² museum warehouse for Bilbao Bizkaia Museoak in Zamudio (Bizkaia).

Sector:
Museum / logistics
Location:
Zamudio. Bizkaia
Client:
Bilbao Bizkaia Museoak
Status:
Finalized
3

One of the main requirements of the project was to make the most of the available useful surface by optimizing the storage capacity for which, among other strategies, a special area is projected based on vertical robotic cabinets with movement on rails that multiplies the capacity of the space.

incendios

Given the heritage value and special nature of the goods to be stored, no less important was guaranteeing the safety and correct maintenance of the works, which is why, after an exhaustive study regarding fire protection, different sectors of independent storage depending on the composition of each piece, generating watertight spaces with specific extinguishing systems, among which a gas extinguishing system stands out.

2

The level of detail achieved in the compartmentalization of the different spaces offers the opportunity to independently regulate the environmental conditions of temperature and humidity in each area, for which a specific large room is incorporated in which to install all the machines ordered. to cover the strict needs.

 

Museo Arqueológico Bilbao / Arkeologi Museoa

Bilboko Arkeologi Museoa eraikinaren fatxadaren hornikuntza-harresiaren egonkortasunari buruzko txosten teknikoa idaztea.

Txosten teknikoak
GLA Arasur

Drafting of the Execution Project, Activity Project, license management and Construction Management for the implementation of a production plant of 8,200m² for Gestamp in the Arasur de Rivabellosa Logistics Park (Araba).

Projects and Construction Management
Captura de pantalla 2021-11-05 a las 13.05.46

Asistencia Técnica en labores de arquitecto de la propiedad para el proyecto de Reforma Integral del Euskal Museoa en Bilbao (Bizkaia).

 

Project Management / Monitoring
Ikea Barakaldo

Dagoeneko 10 urte baino gehiago daramatzagu Ikeari zerbitzua ematen, eta horietan Barakaldoko (Bizkaia) Dendaren zuzendaritzaren leialtasuna lortu dugu gure dedikazio eta hurbiltasunaren bidez; izan ere, zuzendaritza horretan hainbat gauzatze-proiektu, lizentzien kudeaketa eta obra-zuzendaritza egin ditugu, instalazioak optimizatzeko.

Proiektuak eta obra Zuzendaritza
img

Bilboko Euskal Museoa osorik eraberritzeko proiekturako jabetzako arkitekto-lanetarako laguntza teknikoa.

 

Project Management
Imagen nitra

Project Management en el proceso de desarrollo del proyecto y construcción de la nueva planta productiva de Gestamp en Nitra-Eslovaquia.

Project Management / Monitoring
EDIFICIO

Technical assistance in property architect work for the New Building Phase 3 project in the AIC complex in Boroa, Amorebieta-Etxano (Bizkaia).

Project Management
1

Redacción de Proyecto de Ejecución, Proyecto de Actividad, gestión de licencias y Dirección de Obra para habilitación de nave como almacén museístico de 1.200 m² para Bilbao Bizkaia Museoak en Zamudio (Bizkaia).

Proyectos y Dirección de Obra